Case Study Bischof + Klein

Rationalization brings half a million euros in two years

Considerably less wasted ink, shorter setup times and optimized ink preparation: Siegwerk’s On-Site Consulting Unit has exceeded joint goals set by flexible(s) specialists Bischof + Klein. The bottom line is clear: savings in ink preparation of more than half a million euros over a period of two years, 44% less liquid waste to date, and a reduction in total setup times for rotogravure printing of 11% and for flexographic printing of 13%. Those responsible at Bischof + Klein are thoroughly satisfied with two projects carried out by the On-Site Consulting Unit at Siegwerk’s long-standing customer.

PDF Download